OUR HISTORY OF JOBS
UP-COMING
- ECO BOTANIC 2 (2 UNITS)
- SUNWAY GRID RESIDENCE (2 UNITS)
- MCHB (KLUANG) SHOWHOUSE
- PETRON PETROL KIOSK
- CORPORATE PRODUCT SHOWROOM & OFFICE
ON-GOING
- SUNWAY CITRINE LAKEHOMES (2 UNITS)
- SUNWAY GRID RESIDENCE (2 UNITS)
2023 |
Residential - Interior design & renovation to 7 units of Double-Storey Terrace House including Architectural works, M&E works at Sunway Citrine Lakehomes, Iskandar Puteri, Johor, Malaysia. (Various types) |
2023 |
Residential - Interior design & renovation to 5 units Condominium including Architectural works, M&E works at Sunway Grid Residence, Iskandar Puteri, Johor, Malaysia. (Various types) |
2023 |
Commercial - Interior design & renovation to Banseok Church including M&E works, architectural and intertior fitting works at Pusat Perdagangan Ion, Medini, Iskandar Puteri, Johor, Malaysia. |
2023 | Residential - Interior design & renovation to Double-Storey Terrace House including Architectural works, M&E works at Rini Height, Skudai, Johor, Malaysia. |
2022 |
Residential - Interior design & renovation to Condominium unit including Architectural works, M&E works at Sunway The Grid, Iskandar Puteri, Johor, Malaysia. |
2022 |
Residential - Interior design & renovation to 2 Storey Terrace House including Architectural works, M&E works at Sunway Citrine Lakehomes, Iskandar Puteri, Johor, Malaysia. |
2022 |
Academy, CoffeeMBA Academy - Interior design & renovation including M&E works, architectural and intertior fitting works at Southkey, Johor, Malaysia. |
2022 |
Commercial, Ramen Hitoyoshi F&B outlet - Interior design & renovation to commercial shoplot including M&E works, architectural and intertior fitting works at Austin, Johor, Malaysia. |
2022 |
Commercial, doTERRA Workshop & Retails - Interior design & renovation to commercial shoplot including M&E works, architectural and intertior fitting works at Jalan Molek, Johor, Malaysia |
2022 |
Residential - Interior design & renovation to Single Storey Terrace house including structure extension works, M&E works and architectural works at Selesa Jaya, Johor, Malaysia. |
2021 |
Residential - Renovation to Double Storey Terrace house Including Architectural works at Taman Sri Austin, Johor, Malaysia. |
2021 |
Residential - Renovation to Double Storey Terrace house Including Architectural works at Taman Pulai Flora, Johor, Malaysia. |
2021 |
Residential - Single Terrace house with architectural and interior fitting works at Taman Pelangi, Johor, Malaysia. |
2021 |
Academy - Building maintenance works Raffles Internation School at Iskandar Putri, Johor, Malaysia. |
2021 |
Residential - 3 Storey cluster house including structure extension works, infrastructure works, M&E works and architectural works at Mutiara Mas, Johor, Malaysia. |
2020 |
Residential - Single Storey Terrace house with M&E works, architectural and interior fitting works at Taman Ungku Tun Aminah, Johor, Malaysia. |
2020 |
Residential - Condominium Interior design & interior fitting work at Twin Danga Residance, Johor, Malaysia. |
2020 |
Residential - Single Storey Terrace house extension including structure works, M&E works and architectural works at Selesa Jaya, Johor, Malaysia. |
2020 |
Residential - Single Storey Terrace house extension including structure works, M&E works and architectural works at Selesa Jaya, Johor, Malaysia. |
2020 |
Commercial - Erection of 7 Storey Single-user Business Park (White) Devrlopment Comprising 1 Basement Carpark and 1 Basement Mezzanine at Cleantech Loop, Singapore. |
2019 |
Residential - Interior design Double Storey Terrace house with structure works, M&E works, architectural and interior fitting works at The Green Horizon Hill, Johor, Malaysia. |
2019 |
Residential - Interior architectural and interior fitting works at Taman Desa Tebrau, Johor, Malaysia. |
2018 |
Erection of New Secondary School at Punggol Site 15, Sumang Walk (Yusof Ishak Secondary School), Singapore. |
2017 |
Woodlands St 11 & St 13 - Widening of public carriageway (LTA) including the construction of roadside drains & box culverts with micropiles, CBP walls & stabilization of slopes, LTA bus shelters. |
2016 |
Singapore Botanic Garden - Construction of visitor service building with infrastructure, M&E services and architectural fittings & finishes. Construction of bridge crossing the lake, architectural works and landscape works. |
2016 |
Choa Chu Kang Cemetery - Works area 34,820.53 M2. Construction cemetry estate including the construction of amenities building blocks with estate infrastructure, M&E services and architectural fittings & finishes. Construction of natural swale, bridge, hardscape & softscape works. |
2015 |
Refurbishment of Casino at Level 3 of the Existing Marina Bay Sands Integrated Resort at No. 8 Bayfront Avenue 018955, Singapore. |
2015 |
Workshop and 3 Units of Prefabricated Prefinished Volumetric Construction (PPVC) Prototype Factory at Akoya Oxygen, Dubai, United Arab Emirates.. |
2015 |
Mixed Development Commercial Development Project known as “Angkasa Icon City” at Mukim Dengkil, Negeri Selangor, Malaysia. |
2015 |
HDB Tampines N8C29 (Total: 424 Dwelling Units) and Contingency Works, Singapore. |
2015 |
3 Belilions Road – Hilton Garden Inn Exterior Works, Public Areas, Back of House and General Work, Singapore. |
2015 |
700 Beach Road – 15 storey hotel development, |
2015 |
HDB Yishun N4C20 (Total: 756 Dwelling Units) and |
2015 |
5 Marine Parade Central – 4 storey commercial building |
2015 |
Admiralty Park Green Corridor- Construction of bridge on mangrove forest (conservation area), amenities building with M&E services & architectural fittings & finishes. |
2013 |
HDB MSCP - Construction of new roof shelters with fire fighting system, upgrading works, RC structure strengthening works & Lifts for seven (7) blocks of HDB MSCP. |
2013 |
Singapore Polytechnic - Construction of a three (3) storey building (total floor area of 2,178 M2) with M&E services, Architectural fittings & finishes, Glass curtain wall, Aluminum & glazing works, overhead bridge, softscape & landscape. |
2013 |
Big Box – 8 storey warehouse retail complex at Jurong East, |
2013 |
JTC Food Hub – 7 Storey multiple-user warehouse /factory |
2012 |
Gillman Barracks Art Museum Estate - Construction of new building, substation, infrastructure for entire estate, transform entire estate into Art museum estate. |
2012 |
Nanyang Community Club - Construction of overhead pedestrian bridge, lifts, building extension, architectural fittings & finishes for dancing studio, KTV, library & Office. |
2011 |
Additional and Alteration to Admin Building and teaching block 5 with new entrance canopy at Singapore Polytechnics, Singapore. |
2010 |
Additions & Alteration to Citigold Branch at Marina Bay Sand Floor Unit #01-16, 10 Bayfront Avenue, Singapore. |
2010 |
Interior fit-out works and renovation to Wipro Singapore Pte Ltd at 3 Changi Business Park Crescent Plaza |
2010 |
Interior fit-out works to Megaman (Singapore) Electrical & Lighting Pte Ltd at 10 Ubi Crescent #03-19 Ubi Tech Park, Singapore. |
2010 |
A&A to Citigold Branch at Marina Bay Sand, Floor unit 01-16 10 Bayfront Avenue, Singapore for Citibank. |
2010 |
Interior Fit-out work at Rochor Road, Fu Lu Shou Complex for UOB (United Overseas Bank). |
2010 |
Additions & alterations to ubiquity citigold branch at level 1&2 CPF Building, Jurong East ST 13 FOR CITIBANK N.A., SINGAPORE BRANCH. |
2010 |
Interior Design & Build Services for Allen & Overy LLP at Level 9, 50 Colley Quay, Singapore. |
2010 |
>Interior Fit-Out Works for Infosys Technologies Singapore, Plaza 8 Changi Business Park, Singapore. |
2010 |
Academy, Singapore Polytechnic - Extension of two (2) storey structure building, Architectural fittings & finishes, viewing decks, glass curtain wall, aluminum cladding. Construction of pond with pump and filtration system, hardscape & softscape. |
2009 |
HDB Branch Office - A&A to three (3) storey office building including Structural works, Architectural works, M&E works, Fire fighting & ACMV works. |
2009 |
HDB Residential Blocks - Construction of lifts and architectural works to seven (7) HDB residential blocks at multiple locations in Singapore. |
2009 |
Demolition of entire double storey Semi-Detached residential unit and construct new double storey Semi-Detached residential unit at Petaling Jaya, Selangor, Malaysia. |
2009 |
Additional of lift shaft from B1 to Level 2 for EASTIN Hotel, Petaling Jaya, Selangor, Malaysia. |
2008 |
Platinum Park Phase 4, 50-storey Menara Felda at Jalan Stonor, Kuala Lumpur, Malaysia. |
2007 |
4 Blocks of Police Quarters at Batu Pahat, Johor, Malaysia. |